Screw compressor overhaul   Working Procedure
     
  1. Dismantle the oil strainer cover and to release the existing oil.
   
  2. Check motor and suction strainer after dismantle the motor cover.
   
  3. Dismantle the locker washer, the rotor and the oil separator.
   
  4. Dismantle the end cover and the lock nut.
   
  5. Dismantle the roller bearing and the ball bearing.
   
  6. Check and clear the screw rotor after dismantling the screw rotor.
   
 
7. Heat up the new acts of bearing bewteen 100℃ and 120℃ according to the specification.
   
  8. Cool the bearing support by dipping into the dry ice or liquid refrigerant.
   
  9. Install the bearing and complete the reassembling process.
   
 
10. Final quality control to re-examine if all stages of the reassembling process has been completed and signed-off.
   
  11. Testing and Commissioning.
   
 
     